{"id":46723,"date":"2013-11-29T00:00:00","date_gmt":"2013-11-29T00:00:00","guid":{"rendered":""},"modified":"2013-11-29T00:00:00","modified_gmt":"2013-11-29T00:00:00","slug":"t1-and-t2-linked-by-train-malpensa-believe-in-the-future","status":"publish","type":"post","link":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/","title":{"rendered":"T1 and T2 linked by train, Malpensa believe in the future"},"content":{"rendered":"<p>&nbsp;<span style=\"font-family: 'Times New Roman', serif; font-size: 12pt;\">This morning (27 November), in Malpensa, has been made official a news that was already in the air for some time. <\/span><b style=\"font-family: 'Times New Roman', serif; font-size: 12pt;\">An important financing for the realisation of the railway link between Terminal 1 and Terminal 2 has been made available.<\/b><span style=\"font-family: 'Times New Roman', serif; font-size: 12pt;\"> It will completely connect with all the trains, national and international, and the air terminal. <\/span><b style=\"font-family: 'Times New Roman', serif; font-size: 12pt;\">The route will be 3.4 km long with a cost of 115 millions of Euros, and it will introduce a future European large project<\/b><span style=\"font-family: 'Times New Roman', serif; font-size: 12pt;\">, that has to be financed, of connecting with Gallarate, and so with the rails which lead to Gotthard and Sempione, that will consider a new railway in the future.<\/span><\/p>\n<p class=\"Default\"><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;\nmso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\">But let&#8217;s turn back to the project announced today: the link between T1 and T2. <b>Sea will invest 16 million of Euros. The EU promised 23 million non repayable, the Region will invest 30 and the remainder come from the Government. The Sea President Pietro Modiano is confident<\/b>: &quot;we will create a link between the current railway and a new station at T2, but the project is much bigger. It is the essential element that will connect us to the North, to Switzerland. It is the signal of our confidence in one of the crucial systems of our Country. Today I&#8217;ve been in Cargo City and since I&#8217;m from Milan I didn&#8217;t know about its existence. But here pass a part of the Italian freight traffic. The link between the two terminals is a point that makes<\/span><span lang=\"NL\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;mso-hansi-font-family:\n&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;;mso-ansi-language:\nNL\"> us proud. <\/span><b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:\n&quot;Times New Roman&quot;,&quot;serif&quot;;mso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:\n&quot;Arial Unicode MS&quot;\">There are 3.4 km but Europe will invest because it is a strategic action<\/span><\/b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:\n&quot;Times New Roman&quot;,&quot;serif&quot;;mso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:\n&quot;Arial Unicode MS&quot;\">, and it is this signal of hope that I want to underline.&quot; he said.<\/span><span lang=\"EN-US\" style=\"font-size:12.0pt;\nfont-family:&quot;Times New Roman&quot;,&quot;serif&quot;;mso-fareast-font-family:&quot;Times New Roman&quot;\"><o:p><\/o:p><\/span><\/p>\n<p class=\"Default\"><b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;\nmso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\">The council member of Infrastructures Maurizio Del Tenno<\/span><\/b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;\nmso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\"> remembered that: &quot;<b>Malpensa will be the entryway of the Expo<\/b>. The Lombardy system has held its head high and looked beyond. The goal is to lead Malpensa to the group of large European airports. The extension of the current rail intersection <\/span><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:\n&quot;Times New Roman&quot;,&quot;serif&quot;;mso-ascii-font-family:Helvetica;mso-bidi-font-family:\n&quot;Arial Unicode MS&quot;\">&egrave;<\/span><span lang=\"EN-US\" style=\"font-size:12.0pt;\nmso-hansi-font-family:&quot;Times New Roman&quot;\"> <\/span><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;mso-hansi-font-family:\n&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\">a strong point. Few weeks ago the EU have financed the project and the Government have already written a formal employment letter to guarantee the financing.&quot;<\/span><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;\nmso-fareast-font-family:&quot;Times New Roman&quot;\"><o:p><\/o:p><\/span><\/p>\n<p class=\"Default\"><b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;\nmso-hansi-font-family:&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\">The Lombardia president Roberto Maroni believes in it:<\/span><\/b><span lang=\"EN-US\" style=\"font-size:12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;mso-hansi-font-family:\n&quot;Arial Unicode MS&quot;;mso-bidi-font-family:&quot;Arial Unicode MS&quot;\"> &quot; I&#8217;m here to testify my interests and commitment about Malpensa, so that it can realise completely its vocation of international airport. Alitalia didn&#8217;t believe in this project and that brought negative consequences, but Malpensa has invested anyway. In the extension between T1 and T2 the Region paid 30 million of Euros. We have the obligation of Minister Lupi. And not only that. There is the promise of the Government also for Pedemontana if we want to talk about other infrastructures of Lombardy. <b>The infrastructural system is essential and the Region must be competitive.&quot;<\/b> Maroni added: &quot; It is my interest that&nbsp; Sea will success, even if we&#8217;re not shareholders. Not all that happens in Lombardy depend on me, but everything happening there is my business.&quot;<\/span><span lang=\"EN-US\" style=\"font-size:\n12.0pt;font-family:&quot;Times New Roman&quot;,&quot;serif&quot;;mso-fareast-font-family:&quot;Times New Roman&quot;\"><o:p><\/o:p><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[44],"tags":[365,1651],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>T1 and T2 linked by train, Malpensa believe in the future<\/title>\n<meta name=\"description\" content=\"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\" \/>\n<meta property=\"og:locale\" content=\"it_IT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T1 and T2 linked by train, Malpensa believe in the future\" \/>\n<meta property=\"og:description\" content=\"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\" \/>\n<meta property=\"og:site_name\" content=\"VareseNews\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/varesenews\/\" \/>\n<meta property=\"article:published_time\" content=\"2013-11-29T00:00:00+00:00\" \/>\n<meta name=\"author\" content=\"Redazione VareseNews\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@varesenews\" \/>\n<meta name=\"twitter:site\" content=\"@varesenews\" \/>\n<meta name=\"twitter:label1\" content=\"Scritto da\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione VareseNews\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo di lettura stimato\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minuti\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\"},\"author\":{\"name\":\"Redazione VareseNews\",\"@id\":\"https:\/\/www.varesenews.it\/#\/schema\/person\/fb20c4da0b7b16c291707a20db73e169\"},\"headline\":\"T1 and T2 linked by train, Malpensa believe in the future\",\"datePublished\":\"2013-11-29T00:00:00+00:00\",\"dateModified\":\"2013-11-29T00:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\"},\"wordCount\":502,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.varesenews.it\/#organization\"},\"keywords\":[\"Malpensa\",\"treno\"],\"articleSection\":[\"In English\"],\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\",\"url\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\",\"name\":\"T1 and T2 linked by train, Malpensa believe in the future\",\"isPartOf\":{\"@id\":\"https:\/\/www.varesenews.it\/#website\"},\"datePublished\":\"2013-11-29T00:00:00+00:00\",\"dateModified\":\"2013-11-29T00:00:00+00:00\",\"description\":\"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#breadcrumb\"},\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"VN\",\"item\":\"https:\/\/www.varesenews.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Canali Tematici\",\"item\":\"https:\/\/www.varesenews.it\/category\/canali-tematici\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"In English\",\"item\":\"https:\/\/www.varesenews.it\/category\/canali-tematici\/in-english\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"T1 and T2 linked by train, Malpensa believe in the future\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.varesenews.it\/#website\",\"url\":\"https:\/\/www.varesenews.it\/\",\"name\":\"VareseNews\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.varesenews.it\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.varesenews.it\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"it-IT\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.varesenews.it\/#organization\",\"name\":\"VareseWeb Srl\",\"url\":\"https:\/\/www.varesenews.it\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/www.varesenews.it\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.varesenews.it\/wp-content\/uploads\/2023\/08\/VARESEWEB.png\",\"contentUrl\":\"https:\/\/www.varesenews.it\/wp-content\/uploads\/2023\/08\/VARESEWEB.png\",\"width\":304,\"height\":304,\"caption\":\"VareseWeb Srl\"},\"image\":{\"@id\":\"https:\/\/www.varesenews.it\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/varesenews\/\",\"https:\/\/twitter.com\/varesenews\",\"https:\/\/instagram.com\/varesenews\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.varesenews.it\/#\/schema\/person\/fb20c4da0b7b16c291707a20db73e169\",\"name\":\"Redazione VareseNews\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\/\/www.varesenews.it\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.varesenews.it\/wp-content\/uploads\/2020\/12\/logo_VN_colori_500.png\",\"contentUrl\":\"https:\/\/www.varesenews.it\/wp-content\/uploads\/2020\/12\/logo_VN_colori_500.png\",\"caption\":\"Redazione VareseNews\"},\"url\":\"https:\/\/www.varesenews.it\/persona\/redazione1\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"T1 and T2 linked by train, Malpensa believe in the future","description":"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/","og_locale":"it_IT","og_type":"article","og_title":"T1 and T2 linked by train, Malpensa believe in the future","og_description":"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.","og_url":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/","og_site_name":"VareseNews","article_publisher":"https:\/\/www.facebook.com\/varesenews\/","article_published_time":"2013-11-29T00:00:00+00:00","author":"Redazione VareseNews","twitter_card":"summary_large_image","twitter_creator":"@varesenews","twitter_site":"@varesenews","twitter_misc":{"Scritto da":"Redazione VareseNews","Tempo di lettura stimato":"2 minuti"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#article","isPartOf":{"@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/"},"author":{"name":"Redazione VareseNews","@id":"https:\/\/www.varesenews.it\/#\/schema\/person\/fb20c4da0b7b16c291707a20db73e169"},"headline":"T1 and T2 linked by train, Malpensa believe in the future","datePublished":"2013-11-29T00:00:00+00:00","dateModified":"2013-11-29T00:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/"},"wordCount":502,"commentCount":0,"publisher":{"@id":"https:\/\/www.varesenews.it\/#organization"},"keywords":["Malpensa","treno"],"articleSection":["In English"],"inLanguage":"it-IT","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/","url":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/","name":"T1 and T2 linked by train, Malpensa believe in the future","isPartOf":{"@id":"https:\/\/www.varesenews.it\/#website"},"datePublished":"2013-11-29T00:00:00+00:00","dateModified":"2013-11-29T00:00:00+00:00","description":"The line will be 3.4 km long, it will cost 115 millions of Euros, and it will be a prelude to an European big project: Sea, Lombardy Region and Government are involved in the financing.","breadcrumb":{"@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#breadcrumb"},"inLanguage":"it-IT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.varesenews.it\/2013\/11\/t1-and-t2-linked-by-train-malpensa-believe-in-the-future\/46723\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"VN","item":"https:\/\/www.varesenews.it\/"},{"@type":"ListItem","position":2,"name":"Canali Tematici","item":"https:\/\/www.varesenews.it\/category\/canali-tematici\/"},{"@type":"ListItem","position":3,"name":"In English","item":"https:\/\/www.varesenews.it\/category\/canali-tematici\/in-english\/"},{"@type":"ListItem","position":4,"name":"T1 and T2 linked by train, Malpensa believe in the future"}]},{"@type":"WebSite","@id":"https:\/\/www.varesenews.it\/#website","url":"https:\/\/www.varesenews.it\/","name":"VareseNews","description":"","publisher":{"@id":"https:\/\/www.varesenews.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.varesenews.it\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"it-IT"},{"@type":"Organization","@id":"https:\/\/www.varesenews.it\/#organization","name":"VareseWeb Srl","url":"https:\/\/www.varesenews.it\/","logo":{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/www.varesenews.it\/#\/schema\/logo\/image\/","url":"https:\/\/www.varesenews.it\/wp-content\/uploads\/2023\/08\/VARESEWEB.png","contentUrl":"https:\/\/www.varesenews.it\/wp-content\/uploads\/2023\/08\/VARESEWEB.png","width":304,"height":304,"caption":"VareseWeb Srl"},"image":{"@id":"https:\/\/www.varesenews.it\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/varesenews\/","https:\/\/twitter.com\/varesenews","https:\/\/instagram.com\/varesenews\/"]},{"@type":"Person","@id":"https:\/\/www.varesenews.it\/#\/schema\/person\/fb20c4da0b7b16c291707a20db73e169","name":"Redazione VareseNews","image":{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/www.varesenews.it\/#\/schema\/person\/image\/","url":"https:\/\/www.varesenews.it\/wp-content\/uploads\/2020\/12\/logo_VN_colori_500.png","contentUrl":"https:\/\/www.varesenews.it\/wp-content\/uploads\/2020\/12\/logo_VN_colori_500.png","caption":"Redazione VareseNews"},"url":"https:\/\/www.varesenews.it\/persona\/redazione1\/"}]}},"post_meta":{"id_old":"276927","argomento":"Malpensa","autore_old":"Roberto Rotondo"},"photos":[],"_links":{"self":[{"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/posts\/46723"}],"collection":[{"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/comments?post=46723"}],"version-history":[{"count":0,"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/posts\/46723\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/media?parent=46723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/categories?post=46723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.varesenews.it\/swgapi\/v1\/wp\/v2\/tags?post=46723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}